PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing the Main sprinkler piping at the 1st Floor Facing North (800x600).jpg Installed metal decking at the roof Facing East (800x600).jpg Installed split wire at the (800x600).jpg Installing split wire above the cealing at the 3rd Floor Facing North (800x600).jpg Installing top track at the 2nd Floor Facing North-East (800x600).jpg
Next page Continued installing the Main sprinkler piping at the 1st Floor Facing North (800x600)
Continued installing the Main sprinkler piping at the 1st Floor Facing North (800x600)